5.2GW solar and 19GWh energy storage capacity
In the project, 5.2 gigawatts (GW) power sun energy with power plant 19 gigawatt-hours (GWh) bir battery storage system (BESS) will be integrated. The project, which will be managed by Masdar and EWEC, aims to ensure the continuity of renewable energy with innovative technologies.
The project draws attention with its advanced technology battery storage systems designed to overcome the inherent intermittency of solar energy. This 19GWh storage system will be used to ensure uninterrupted integration of solar energy into the grid. Batteries CATL It will be supplied by TENER technology. Solar panels are Jinko Solar ve JA Solar will be provided by. On the other hand, no information was given about how much the project would cost and when it would be put into operation. Companies also underline that 10 thousand new jobs will be created with this giant project.
Source
https://interestingengineering.com/energy/uae-launches-world-first-24-7-renewable-energy-project
https://www.prnewswire.com/ae/news-releases/uae-president-witnesses-launch-of-worlds-first-247-solar-pv-battery-storage-gigascale-project-to-be-built-in-abu-dhabi-302350818.html
This news our mobile application Download using
You can read it whenever you want (even offline):
Source link: https://www.donanimhaber.com/dunyanin-ilk-kesintisiz-yenilenebilir-enerji-projesi-tanitildi–186688